The state column is honest. "Never measured" and "zero output exists" are results, written with the same care as a number. This is the working list: items move as the work progresses, and each change is dated.
| Item | State |
|---|---|
| A fresh Ethiopia programme authored from the generic architecture | × DOES NOT EXIST the old phase plan is superseded and must not be resumed from the old framing |
| Convergence under the new definition | ? NEVER MEASURED the zero result stands unrefuted |
| Amharic native-speaker review | ∅ IN PROGRESS bundle delivered; the reviewer is working on validation as of 22 August 2026; all Amharic extraction frozen behind it; the bundle itself carries the mojibake and short-passage defects |
| Amharic retrieval and extraction quality | ? UNMEASURED a hand-checked set is the prerequisite for any parity claim |
| Amharic ASR | × ZERO OUTPUT the only attempt died on a CUDA library |
| Chyron OCR | ? NEVER RUN designed, never run |
| Device rendering of Ethiopic | ? UNCONFIRMED on real low-end hardware |
| Translation review markers | ∅ LOCKED decision in force; the working name still awaits native-speaker naming review |
| World Bank batch 5 | ∅ STALLED two permanent 404s with no registered repair operation |
| Blocked sources | ∅ BLOCKED Addis Standard and Zehabesha 403 with browser capture modelled but not built; ENA feed path unknown; Fana never probed; VOA per-item rights determination pending |
| EDGE triage veto | ∅ WAITING 19 subjects awaiting a decision since 18 July |
| Calendar handling in ingestion | × NO RULE for Ethiopian-calendar dates in article bodies |
| Four verdict findings never dispatched | ∅ UNDISPATCHED route class missing from records; 1,147 entity citations pointing at deleted captures; contracts green in fixtures but unwired to the store; a stale stop-report shipped in the tree |
The badge leads and the sentence continues; the badge never replaces the sentence. Solid border, terminal; dashed, blocked but alive; dotted, unresolved.
build report §7 · retrieved 2026-08-21
The four questions
The retrospective says these must be answered before acquiring anything again:
- What questions must the corpus answer?
- Is the recency skew wanted? The current window excludes the completion reports where outcomes live.
- One vault or two? The Wikipedia citation layer pointing at primary sources is arguably a third corpus.
- Where do adjudications physically sit?
None of the four has an answer in the record yet. They are the questions the next pass must answer first.
user-beadwork/retrospectives/ethiopia-corpora-lessons.md · retrieved 2026-08-21
Ask your AI about this page
Paste this page's link into ChatGPT, Claude, or any AI assistant and ask your question in your own words. Every page here publishes a machine-readable copy, so your assistant can read the record directly:
https://ethiopia-build.stoagen.com/timeline/open-items/
Every page here has a markdown twin; this page's is https://ethiopia-build.stoagen.com/timeline/open-items/index.md (also served with .txt appended). The whole site is mapped in one small file at https://ethiopia-build.stoagen.com/site_guide.txt, https://ethiopia-build.stoagen.com/llms.txt describes how the record is organized, and https://ethiopia-build.stoagen.com/agents/ carries the site's notes for assistants.
Published . Last updated . Times come from this page's revision history and can be checked against it.