Chapter 05

Timeline

Dated from tickets and commits. The first pass ran from 14 July to 11 August 2026, thirty days from the first vault verification to the night the Ethiopia programme was filed and superseded by a generic architecture. Later rows are added as the work continues.

Date Event
07-14 Librarian verifies vault tooling against the World Bank vault (1,393 notes)
07-16 Ethiopia Wikipedia revision 1364352475, the revision the vault is stamped to
07-18 The Ethiopian seat forked; vault doctrine, seed, triage A 407 / B 774 / EDGE 19; nine Codex ingestion batches land 405 articles, 727 anchors, 328 claims; two candidates byte-identical across 1,151 files
07-19 Common Voice Ethiopian-language audit; VOA caption audit negative
07-20 12,650 citations mined; source families batches 0 and 1; World Bank batch 0
07-21 ethiopia-program coordination repo initialized; umbrella migration; low-resource access policy
07-22 Five design artifacts; archivist finds the unlabelled Amharic string; the sandbox identity failure that produced the trusted execution broker
07-23 YouTube day: VOA caption test negative, inventory rejected over /videos versus /streams, the faster-whisper run dies on cublas64_12.dll; World Bank batch 4 authorized; the ethiopia repo's local .git found gutted
07-24 News contract and seven schemas; six publisher bindings; first live bounded discovery (20 observations, 10 English, 10 Amharic, zero failures); batch 4 accepted (1,250 documents); bilingual pilot: English normalizes, Amharic fails the body container, both withdrawn over chrome, both repaired; batch 5 404s; seven-source feed probe; no /llms.txt anywhere; video/OCR pipeline designed
07-25 The evidence-relative ruling: no binary truth gate; the Civ6 source record and the auto-backup incident
08-01 oo-ld-corpus created; Phase 1 (lossless round-trip) and Phase 2 (rebuild determinism) gates pass
08-02 Independent adversarial re-verification; the repo gets a remote after two clean phases existed only on one disk; 43 Amharic articles captured; extraction run: 55 documents, 766 assertions; the deterministic Amharic corruption caught; convergence measured at zero; the delivery-tiers brief (SMS, fonts, retrieval parity)
08-03 "This workspace publishes, it does not build corpora": sixteen tickets closed, vaults frozen, dispatching seat removed; R6 no-Amharic-re-extraction; the clipped-span and zero-cross-document-IRI defects filed
08-04 275 MB of duplicated batched Wikipedia payloads; 500 undatable World Bank documents; the corpus is deleted at ec90afe
08-05 Re-capture dispatched with an acceptance test of "answers, not a gate report"; 44 English news documents captured; AllAfrica blocks the machine; the "a probe is a capture" rule
08-06 Acceptance-test preflight; entity matching found degenerate
about 08-09 The Amharic native-speaker review bundle assembled
08-11 Lens-graph plan v1 through v3.2 in one evening; the Ethiopia programme filed and superseded the same night; end of the first pass
08-21 The build report compiled from repository, ticket and transcript evidence
08-22 This site published; the Amharic native-speaker validation under way

All dates are 2026. Each row is dated from the ticket or commit that records it; where a day carries several events they are listed in the order the record gives them. Rows are added as the work continues.

build report §6 · ticket stores etp-, eth-, oo-ld-co-, u-- · retrieved 2026-08-21

What is still open

Everything the programme left unresolved, with an honest state for each, is on the open items page.

Ask your AI about this page

Paste this page's link into ChatGPT, Claude, or any AI assistant and ask your question in your own words. Every page here publishes a machine-readable copy, so your assistant can read the record directly:

https://ethiopia-build.stoagen.com/timeline/

Published . Last updated . Times come from this page's revision history and can be checked against it.